Welcome to Auto, Motorcycle Parts & Accessories official website!
Gasket Kit for Royal Enfield Classic 350: Folding Type

Gasket Kit for Royal Enfield Classic 350: Folding Type

Gasket Kit for Royal Enfield Classic 350: Folding TypeThis gasket kit is built for the Royal Enfield Classic 350 and supplied to a written specification, so the part that comes off the line in the.

Contact Number:
Product Details

Gasket Kit for Royal Enfield Classic 350: Folding Type

This gasket kit is built for the Royal Enfield Classic 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Gasket Kit for Royal Enfield Classic 350

Specification

PartGasket Kit
FitmentRoyal Enfield Classic 350
VersionFolding Type
Base materialZinc Plated Steel
Typical useMining Sites
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Royal Enfield Classic 350 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Gasket Kit production

Processes used on this line

  • die casting
  • powder coating
  • injection moulding
  • laser cutting
  • robot welding
  • heat treatment

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The folding type build is the one most often ordered for mining sites. Riders also fit it for daily commuting, long-distance touring, roadside assistance, security patrols.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top