Welcome to Auto, Motorcycle Parts & Accessories official website!
Wheel Hub for Royal Enfield Bullet 350: Drilled and Slotted

Wheel Hub for Royal Enfield Bullet 350: Drilled and Slotted

Wheel Hub for Royal Enfield Bullet 350: Drilled and SlottedThis wheel hub is built for the Royal Enfield Bullet 350 and supplied to a written specification, so the part that comes off the line in the.

Contact Number:
Product Details

Wheel Hub for Royal Enfield Bullet 350: Drilled and Slotted

This wheel hub is built for the Royal Enfield Bullet 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Wheel Hub for Royal Enfield Bullet 350

Specification

PartWheel Hub
FitmentRoyal Enfield Bullet 350
VersionDrilled and Slotted
Base materialChromed Steel
Typical useMotocross
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-35 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Royal Enfield Bullet 350 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Wheel Hub production

Processes used on this line

  • CNC machining
  • assembly line testing
  • sintering
  • die casting
  • cold forging
  • anodising

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The drilled and slotted build is the one most often ordered for motocross. Riders also fit it for off-road trails, security patrols, urban courier work, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top