Welcome to Auto, Motorcycle Parts & Accessories official website!
Oil Filter for Aprilia RS 125: Two-Piece Construction

Oil Filter for Aprilia RS 125: Two-Piece Construction

Oil Filter for Aprilia RS 125: Two-Piece ConstructionThis oil filter is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Oil Filter for Aprilia RS 125: Two-Piece Construction

This oil filter is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: packing that arrived crushed at the port, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Oil Filter for Aprilia RS 125

Specification

PartOil Filter
FitmentAprilia RS 125
VersionTwo-Piece Construction
Base materialAluminium Alloy
Typical useMining Sites
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceSAE J431

What decides whether it lasts

  • Material — Aluminium Alloy is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Aprilia RS 125 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Oil Filter production

Processes used on this line

  • injection moulding
  • CNC machining
  • precision stamping
  • laser cutting
  • robot welding
  • shot blasting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The two-piece construction build is the one most often ordered for mining sites. Riders also fit it for daily commuting, night riding, long-distance touring, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top