Welcome to Auto, Motorcycle Parts & Accessories official website!
Fork Spring for Dayun 150: Lightweight Version

Fork Spring for Dayun 150: Lightweight Version

Fork Spring for Dayun 150: Lightweight VersionThis fork spring is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Fork Spring for Dayun 150: Lightweight Version

This fork spring is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the lightweight version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fork Spring for Dayun 150

Specification

PartFork Spring
FitmentDayun 150
VersionLightweight Version
Base materialPU Leather
Typical useNight Riding
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-35 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — PU Leather is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fork Spring production

Processes used on this line

  • sintering
  • surface grinding
  • electroplating
  • CNC machining
  • anodising
  • heat treatment

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The lightweight version build is the one most often ordered for night riding. Riders also fit it for ride-hailing fleets, passenger transport, wet weather riding, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top