Flasher Relay for Yamaha Ténéré 700: Racing Spec
This flasher relay is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the racing spec programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a supplier who changed material without saying so, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Flasher Relay |
|---|---|
| Fitment | Yamaha Ténéré 700 |
| Version | Racing Spec |
| Base material | Neoprene |
| Typical use | Track Days |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Neoprene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- surface grinding
- die casting
- laser cutting
- electroplating
- rubber vulcanisation
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The racing spec build is the one most often ordered for track days. Riders also fit it for track days, ride-hailing fleets, night riding, adventure travel.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







