Welcome to Auto, Motorcycle Parts & Accessories official website!
Fairing Kit for Zongshen 150: OEM Replacement

Fairing Kit for Zongshen 150: OEM Replacement

Fairing Kit for Zongshen 150: OEM ReplacementThis fairing kit is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Fairing Kit for Zongshen 150: OEM Replacement

This fairing kit is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fairing Kit for Zongshen 150

Specification

PartFairing Kit
FitmentZongshen 150
VersionOEM Replacement
Base materialAnodised Aluminium
Typical useDelivery Fleets
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Anodised Aluminium is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fairing Kit production

Processes used on this line

  • die casting
  • surface grinding
  • sintering
  • injection moulding
  • ultrasonic cleaning
  • electroplating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The oem replacement build is the one most often ordered for delivery fleets. Riders also fit it for long-distance touring, food delivery, heavy load hauling, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top