Welcome to Auto, Motorcycle Parts & Accessories official website!
Throttle Cable for Suzuki DR200: Two-Piece Construction

Throttle Cable for Suzuki DR200: Two-Piece Construction

Throttle Cable for Suzuki DR200: Two-Piece ConstructionThis throttle cable is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Throttle Cable for Suzuki DR200: Two-Piece Construction

This throttle cable is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Throttle Cable for Suzuki DR200

Specification

PartThrottle Cable
FitmentSuzuki DR200
VersionTwo-Piece Construction
Base materialPowder Coated Steel
Typical useDaily Commuting
MOQ2,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time25-45 days after approval
ComplianceECE R90

What decides whether it lasts

  • Material — Powder Coated Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki DR200 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Throttle Cable production

Processes used on this line

  • injection moulding
  • heat treatment
  • cold forging
  • powder coating
  • gravity casting
  • sintering

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The two-piece construction build is the one most often ordered for daily commuting. Riders also fit it for daily commuting, mining sites, heavy load hauling, off-road trails.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top