Rearview Mirror for Haojue 125: Quick Fit Version
This rearview mirror is built for the Haojue 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the quick fit version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Rearview Mirror |
|---|---|
| Fitment | Haojue 125 |
| Version | Quick Fit Version |
| Base material | Carbon Fibre Composite |
| Typical use | Airport Ground Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Carbon Fibre Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Haojue 125 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- electroplating
- ultrasonic cleaning
- sintering
- powder coating
- injection moulding
- die casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The quick fit version build is the one most often ordered for airport ground fleets. Riders also fit it for long-distance touring, track days, food delivery, security patrols.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







