Welcome to Auto, Motorcycle Parts & Accessories official website!
Indicator Lamp for QJMotor SRK 400: Heavy Duty

Indicator Lamp for QJMotor SRK 400: Heavy Duty

Indicator Lamp for QJMotor SRK 400: Heavy DutyThis indicator lamp is built for the QJMotor SRK 400 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Indicator Lamp for QJMotor SRK 400: Heavy Duty

This indicator lamp is built for the QJMotor SRK 400 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the heavy duty programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Indicator Lamp for QJMotor SRK 400

Specification

PartIndicator Lamp
FitmentQJMotor SRK 400
VersionHeavy Duty
Base materialChromed Steel
Typical useFarm Use
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceSAE J431

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual QJMotor SRK 400 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Indicator Lamp production

Processes used on this line

  • shot blasting
  • heat treatment
  • electroplating
  • die casting
  • rubber vulcanisation
  • injection moulding

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The heavy duty build is the one most often ordered for farm use. Riders also fit it for roadside assistance, urban courier work, long-distance touring, night riding.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top