Welcome to Auto, Motorcycle Parts & Accessories official website!
Fairing Kit for Kawasaki Ninja 250: Drilled and Slotted

Fairing Kit for Kawasaki Ninja 250: Drilled and Slotted

Fairing Kit for Kawasaki Ninja 250: Drilled and SlottedThis fairing kit is built for the Kawasaki Ninja 250 and supplied to a written specification, so the part that comes off the line in the next.

Contact Number:
Product Details

Fairing Kit for Kawasaki Ninja 250: Drilled and Slotted

This fairing kit is built for the Kawasaki Ninja 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fairing Kit for Kawasaki Ninja 250

Specification

PartFairing Kit
FitmentKawasaki Ninja 250
VersionDrilled and Slotted
Base materialSemi-Metallic Compound
Typical usePassenger Transport
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time30-45 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — Semi-Metallic Compound is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Kawasaki Ninja 250 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fairing Kit production

Processes used on this line

  • heat treatment
  • gravity casting
  • laser cutting
  • sintering
  • injection moulding
  • powder coating

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The drilled and slotted build is the one most often ordered for passenger transport. Riders also fit it for mountain roads, wet weather riding, construction sites, roadside assistance.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top