Welcome to Auto, Motorcycle Parts & Accessories official website!
Tank Bag for Yamaha R6: Two-Piece Construction

Tank Bag for Yamaha R6: Two-Piece Construction

Tank Bag for Yamaha R6: Two-Piece ConstructionThis tank bag is built for the Yamaha R6 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Tank Bag for Yamaha R6: Two-Piece Construction

This tank bag is built for the Yamaha R6 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: reorders that did not match the approved sample, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Tank Bag for Yamaha R6

Specification

PartTank Bag
FitmentYamaha R6
VersionTwo-Piece Construction
Base materialCarbon Steel
Typical useFarm Use
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time30-35 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Carbon Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha R6 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Tank Bag production

Processes used on this line

  • surface grinding
  • laser cutting
  • powder coating
  • anodising
  • die casting
  • injection moulding

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for farm use. Riders also fit it for mountain roads, ride-hailing fleets, rural transport, off-road trails.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top