Camshaft for Royal Enfield Himalayan: Two-Piece Construction
This camshaft is built for the Royal Enfield Himalayan and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Camshaft |
|---|---|
| Fitment | Royal Enfield Himalayan |
| Version | Two-Piece Construction |
| Base material | Magnesium Alloy |
| Typical use | Delivery Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Himalayan mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- sintering
- CNC machining
- electroplating
- powder coating
- rubber vulcanisation
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The two-piece construction build is the one most often ordered for delivery fleets. Riders also fit it for mountain roads, airport ground fleets, delivery fleets, long-distance touring.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







