Rear Fender for Honda CG125: Off-Road Version
This rear fender is built for the Honda CG125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Rear Fender |
|---|---|
| Fitment | Honda CG125 |
| Version | Off-Road Version |
| Base material | Natural Rubber |
| Typical use | Airport Ground Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Natural Rubber is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda CG125 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- assembly line testing
- anodising
- rubber vulcanisation
- electroplating
- die casting
- cold forging
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The off-road version build is the one most often ordered for airport ground fleets. Riders also fit it for passenger transport, food delivery, mountain roads, heavy load hauling.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







