Radiator for Sherco 300: OEM Replacement
This radiator is built for the Sherco 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Radiator |
|---|---|
| Fitment | Sherco 300 |
| Version | OEM Replacement |
| Base material | Neoprene |
| Typical use | Daily Commuting |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Neoprene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Sherco 300 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- shot blasting
- electroplating
- die casting
- anodising
- laser cutting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The oem replacement build is the one most often ordered for daily commuting. Riders also fit it for off-road trails, security patrols, rental fleets, long-distance touring.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
Ask for the current catalogue and the specification sheet for this line.







