Welcome to Auto, Motorcycle Parts & Accessories official website!
Rear Fender for Shineray XY125: Heavy Duty

Rear Fender for Shineray XY125: Heavy Duty

Rear Fender for Shineray XY125: Heavy DutyThis rear fender is built for the Shineray XY125 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Rear Fender for Shineray XY125: Heavy Duty

This rear fender is built for the Shineray XY125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the heavy duty programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Rear Fender for Shineray XY125

Specification

PartRear Fender
FitmentShineray XY125
VersionHeavy Duty
Base materialBrass
Typical useMining Sites
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-35 days after approval
ComplianceE-mark

What decides whether it lasts

  • Material — Brass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Shineray XY125 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Rear Fender production

Processes used on this line

  • CNC machining
  • gravity casting
  • rubber vulcanisation
  • cold forging
  • laser cutting
  • electroplating

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The heavy duty build is the one most often ordered for mining sites. Riders also fit it for construction sites, mountain roads, mining sites, food delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top