Fuel Line for Husqvarna FE 350: Load Rated Version
This fuel line is built for the Husqvarna FE 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Fuel Line |
|---|---|
| Fitment | Husqvarna FE 350 |
| Version | Load Rated Version |
| Base material | Reinforced Nylon |
| Typical use | Rural Transport |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-35 days after approval |
| Compliance | SGS |
What decides whether it lasts
- Material — Reinforced Nylon is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Husqvarna FE 350 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- shot blasting
- gravity casting
- cold forging
- CNC machining
- rubber vulcanisation
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The load rated version build is the one most often ordered for rural transport. Riders also fit it for track days, ride-hailing fleets, urban courier work, night riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







