Welcome to Auto, Motorcycle Parts & Accessories official website!
Engine Guard for Suzuki DR200: OEM Replacement

Engine Guard for Suzuki DR200: OEM Replacement

Engine Guard for Suzuki DR200: OEM ReplacementThis engine guard is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Engine Guard for Suzuki DR200: OEM Replacement

This engine guard is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Engine Guard for Suzuki DR200

Specification

PartEngine Guard
FitmentSuzuki DR200
VersionOEM Replacement
Base materialNeoprene
Typical useWeekend Riding
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Neoprene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki DR200 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Engine Guard production

Processes used on this line

  • gravity casting
  • assembly line testing
  • surface grinding
  • CNC machining
  • sintering
  • heat treatment

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The oem replacement build is the one most often ordered for weekend riding. Riders also fit it for delivery fleets, heavy load hauling, motocross, mining sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top