Turn Signal for TVS Apache RTR 160: Drilled and Slotted
This turn signal is built for the TVS Apache RTR 160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Turn Signal |
|---|---|
| Fitment | TVS Apache RTR 160 |
| Version | Drilled and Slotted |
| Base material | Carbon Steel |
| Typical use | Roadside Assistance |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Carbon Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Apache RTR 160 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- anodising
- rubber vulcanisation
- precision stamping
- gravity casting
- injection moulding
- electroplating
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The drilled and slotted build is the one most often ordered for roadside assistance. Riders also fit it for rental fleets, construction sites, urban courier work, night riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







