Welcome to Auto, Motorcycle Parts & Accessories official website!
Radiator for KTM Duke 200: Vented Design

Radiator for KTM Duke 200: Vented Design

Radiator for KTM Duke 200: Vented DesignThis radiator is built for the KTM Duke 200 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Radiator for KTM Duke 200: Vented Design

This radiator is built for the KTM Duke 200 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Radiator for KTM Duke 200

Specification

PartRadiator
FitmentKTM Duke 200
VersionVented Design
Base materialPolypropylene
Typical useRental Fleets
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time25-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Polypropylene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual KTM Duke 200 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Radiator production

Processes used on this line

  • ultrasonic cleaning
  • CNC machining
  • robot welding
  • heat treatment
  • precision stamping
  • assembly line testing

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The vented design build is the one most often ordered for rental fleets. Riders also fit it for airport ground fleets, food delivery, weekend riding, off-road trails.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top