Water Pump for Benelli TNT 300: OEM Replacement
This water pump is built for the Benelli TNT 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Water Pump |
|---|---|
| Fitment | Benelli TNT 300 |
| Version | OEM Replacement |
| Base material | Semi-Metallic Compound |
| Typical use | Night Riding |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Semi-Metallic Compound is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Benelli TNT 300 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- powder coating
- assembly line testing
- die casting
- precision stamping
- robot welding
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The oem replacement build is the one most often ordered for night riding. Riders also fit it for airport ground fleets, security patrols, farm use, rural transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







