Clutch Lever for Dayun 150: Sealed Unit
This clutch lever is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Clutch Lever |
|---|---|
| Fitment | Dayun 150 |
| Version | Sealed Unit |
| Base material | Nylon 66 |
| Typical use | Mountain Roads |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Nylon 66 is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- anodising
- electroplating
- assembly line testing
- precision stamping
- injection moulding
- powder coating
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The sealed unit build is the one most often ordered for mountain roads. Riders also fit it for motocross, adventure travel, track days, construction sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







