Muffler for Honda Activa: Two-Piece Construction
This muffler is built for the Honda Activa and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Muffler |
|---|---|
| Fitment | Honda Activa |
| Version | Two-Piece Construction |
| Base material | Chromed Steel |
| Typical use | Track Days |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | CCC |
What decides whether it lasts
- Material — Chromed Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda Activa mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- precision stamping
- sintering
- robot welding
- CNC machining
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The two-piece construction build is the one most often ordered for track days. Riders also fit it for long-distance touring, farm use, ride-hailing fleets, urban courier work.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







