Clutch Lever for Kawasaki ZX-6R: Reinforced Build
This clutch lever is built for the Kawasaki ZX-6R and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the reinforced build programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Clutch Lever |
|---|---|
| Fitment | Kawasaki ZX-6R |
| Version | Reinforced Build |
| Base material | Silicone |
| Typical use | Coastal Delivery |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | TUV |
What decides whether it lasts
- Material — Silicone is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki ZX-6R mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- CNC machining
- laser cutting
- shot blasting
- die casting
- rubber vulcanisation
- gravity casting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The reinforced build build is the one most often ordered for coastal delivery. Riders also fit it for rental fleets, airport ground fleets, adventure travel, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







