Fuse Box for Lifan 110: Racing Spec
This fuse box is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the racing spec programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Fuse Box |
|---|---|
| Fitment | Lifan 110 |
| Version | Racing Spec |
| Base material | Bronze |
| Typical use | Rural Transport |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Bronze is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Lifan 110 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- gravity casting
- rubber vulcanisation
- sintering
- injection moulding
- heat treatment
- electroplating
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The racing spec build is the one most often ordered for rural transport. Riders also fit it for roadside assistance, daily commuting, wet weather riding, airport ground fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







