Front Fork for Benelli TNT 300: Waterproof Version
This front fork is built for the Benelli TNT 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the waterproof version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Front Fork |
|---|---|
| Fitment | Benelli TNT 300 |
| Version | Waterproof Version |
| Base material | Reinforced Nylon |
| Typical use | Delivery Fleets |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | CCC |
What decides whether it lasts
- Material — Reinforced Nylon is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Benelli TNT 300 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- surface grinding
- powder coating
- rubber vulcanisation
- laser cutting
- robot welding
- heat treatment
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The waterproof version build is the one most often ordered for delivery fleets. Riders also fit it for security patrols, passenger transport, construction sites, urban courier work.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







