Welcome to Auto, Motorcycle Parts & Accessories official website!
Crash Bar for Kawasaki Ninja 250: Two-Piece Construction

Crash Bar for Kawasaki Ninja 250: Two-Piece Construction

Crash Bar for Kawasaki Ninja 250: Two-Piece ConstructionThis crash bar is built for the Kawasaki Ninja 250 and supplied to a written specification, so the part that comes off the line in the next.

Contact Number:
Product Details

Crash Bar for Kawasaki Ninja 250: Two-Piece Construction

This crash bar is built for the Kawasaki Ninja 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Crash Bar for Kawasaki Ninja 250

Specification

PartCrash Bar
FitmentKawasaki Ninja 250
VersionTwo-Piece Construction
Base materialPU Leather
Typical useLong-Distance Touring
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — PU Leather is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Kawasaki Ninja 250 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Crash Bar production

Processes used on this line

  • powder coating
  • precision stamping
  • CNC machining
  • anodising
  • rubber vulcanisation
  • heat treatment

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The two-piece construction build is the one most often ordered for long-distance touring. Riders also fit it for urban courier work, coastal delivery, farm use, mining sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top