Cylinder Kit for Yamaha Ténéré 700: Racing Spec
This cylinder kit is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the racing spec programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Cylinder Kit |
|---|---|
| Fitment | Yamaha Ténéré 700 |
| Version | Racing Spec |
| Base material | Magnesium Alloy |
| Typical use | Adventure Travel |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- injection moulding
- electroplating
- heat treatment
- CNC machining
- anodising
- rubber vulcanisation
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The racing spec build is the one most often ordered for adventure travel. Riders also fit it for rental fleets, long-distance touring, rural transport, security patrols.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







