Muffler for Yamaha FZ16: Drilled and Slotted
This muffler is built for the Yamaha FZ16 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Muffler |
|---|---|
| Fitment | Yamaha FZ16 |
| Version | Drilled and Slotted |
| Base material | Silicone |
| Typical use | Rural Transport |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — Silicone is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha FZ16 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- CNC machining
- cold forging
- surface grinding
- assembly line testing
- rubber vulcanisation
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The drilled and slotted build is the one most often ordered for rural transport. Riders also fit it for farm use, daily commuting, rural transport, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







