Welcome to Auto, Motorcycle Parts & Accessories official website!
Torque Driver for CFMoto 250NK: Upgraded Version

Torque Driver for CFMoto 250NK: Upgraded Version

Torque Driver for CFMoto 250NK: Upgraded VersionThis torque driver is built for the CFMoto 250NK and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Torque Driver for CFMoto 250NK: Upgraded Version

This torque driver is built for the CFMoto 250NK and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Torque Driver for CFMoto 250NK

Specification

PartTorque Driver
FitmentCFMoto 250NK
VersionUpgraded Version
Base materialForged Aluminium
Typical useWeekend Riding
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Forged Aluminium is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual CFMoto 250NK mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Torque Driver production

Processes used on this line

  • powder coating
  • die casting
  • injection moulding
  • electroplating
  • precision stamping
  • heat treatment

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The upgraded version build is the one most often ordered for weekend riding. Riders also fit it for off-road trails, construction sites, night riding, rural transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top