Coolant Hose for KTM RC 390: Sealed Unit
This coolant hose is built for the KTM RC 390 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Coolant Hose |
|---|---|
| Fitment | KTM RC 390 |
| Version | Sealed Unit |
| Base material | Magnesium Alloy |
| Typical use | Daily Commuting |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | CCC |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual KTM RC 390 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- sintering
- ultrasonic cleaning
- surface grinding
- die casting
- injection moulding
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The sealed unit build is the one most often ordered for daily commuting. Riders also fit it for construction sites, urban courier work, mining sites, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







