CVT Belt for Honda Africa Twin: Load Rated Version
This cvt belt is built for the Honda Africa Twin and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | CVT Belt |
|---|---|
| Fitment | Honda Africa Twin |
| Version | Load Rated Version |
| Base material | Polypropylene |
| Typical use | Coastal Delivery |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — Polypropylene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda Africa Twin mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- assembly line testing
- anodising
- heat treatment
- laser cutting
- rubber vulcanisation
- precision stamping
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The load rated version build is the one most often ordered for coastal delivery. Riders also fit it for long-distance touring, ride-hailing fleets, mining sites, adventure travel.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







