Air Box for Kawasaki Z900: Vented Design
This air box is built for the Kawasaki Z900 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Air Box |
|---|---|
| Fitment | Kawasaki Z900 |
| Version | Vented Design |
| Base material | Bronze |
| Typical use | Urban Courier Work |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Bronze is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki Z900 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- ultrasonic cleaning
- electroplating
- laser cutting
- die casting
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The vented design build is the one most often ordered for urban courier work. Riders also fit it for mining sites, adventure travel, night riding, food delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







