Header Pipe for Bajaj Dominar 400: Drilled and Slotted
This header pipe is built for the Bajaj Dominar 400 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Header Pipe |
|---|---|
| Fitment | Bajaj Dominar 400 |
| Version | Drilled and Slotted |
| Base material | EPDM Rubber |
| Typical use | Airport Ground Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — EPDM Rubber is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Dominar 400 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- injection moulding
- ultrasonic cleaning
- laser cutting
- heat treatment
- electroplating
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The drilled and slotted build is the one most often ordered for airport ground fleets. Riders also fit it for long-distance touring, ride-hailing fleets, mining sites, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







