Cam Chain Tensioner for TVS Jupiter: Upgraded Version
This cam chain tensioner is built for the TVS Jupiter and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Cam Chain Tensioner |
|---|---|
| Fitment | TVS Jupiter |
| Version | Upgraded Version |
| Base material | Zinc Plated Steel |
| Typical use | Security Patrols |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | SGS |
What decides whether it lasts
- Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Jupiter mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- CNC machining
- cold forging
- anodising
- heat treatment
- precision stamping
- robot welding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The upgraded version build is the one most often ordered for security patrols. Riders also fit it for long-distance touring, mountain roads, daily commuting, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







