Welcome to Auto, Motorcycle Parts & Accessories official website!
Radiator for Zongshen 150: High Performance

Radiator for Zongshen 150: High Performance

Radiator for Zongshen 150: High PerformanceThis radiator is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Radiator for Zongshen 150: High Performance

This radiator is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Radiator for Zongshen 150

Specification

PartRadiator
FitmentZongshen 150
VersionHigh Performance
Base materialStainless Steel
Typical useMountain Roads
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Stainless Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Radiator production

Processes used on this line

  • precision stamping
  • gravity casting
  • electroplating
  • rubber vulcanisation
  • robot welding
  • ultrasonic cleaning

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The high performance build is the one most often ordered for mountain roads. Riders also fit it for passenger transport, night riding, heavy load hauling, wet weather riding.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top