Kickstart Lever for Hero Splendor: Reinforced Build
This kickstart lever is built for the Hero Splendor and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the reinforced build programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Kickstart Lever |
|---|---|
| Fitment | Hero Splendor |
| Version | Reinforced Build |
| Base material | ABS Plastic |
| Typical use | Security Patrols |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — ABS Plastic is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Hero Splendor mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- electroplating
- sintering
- robot welding
- heat treatment
- cold forging
- rubber vulcanisation
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The reinforced build build is the one most often ordered for security patrols. Riders also fit it for rural transport, night riding, food delivery, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







