Spoke Set for Honda Wave 110: Standard Replacement
This spoke set is built for the Honda Wave 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the standard replacement programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a supplier who changed material without saying so, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Spoke Set |
|---|---|
| Fitment | Honda Wave 110 |
| Version | Standard Replacement |
| Base material | Kevlar Composite |
| Typical use | Ride-Hailing Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Kevlar Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda Wave 110 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- assembly line testing
- powder coating
- gravity casting
- die casting
- precision stamping
- ultrasonic cleaning
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The standard replacement build is the one most often ordered for ride-hailing fleets. Riders also fit it for adventure travel, weekend riding, rental fleets, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







