Welcome to Auto, Motorcycle Parts & Accessories official website!
Crash Bar for Dayun 150: Standard Replacement

Crash Bar for Dayun 150: Standard Replacement

Crash Bar for Dayun 150: Standard ReplacementThis crash bar is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Crash Bar for Dayun 150: Standard Replacement

This crash bar is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the standard replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Crash Bar for Dayun 150

Specification

PartCrash Bar
FitmentDayun 150
VersionStandard Replacement
Base materialNatural Rubber
Typical useCoastal Delivery
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceRoHS

What decides whether it lasts

  • Material — Natural Rubber is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Crash Bar production

Processes used on this line

  • rubber vulcanisation
  • surface grinding
  • robot welding
  • electroplating
  • cold forging
  • anodising

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The standard replacement build is the one most often ordered for coastal delivery. Riders also fit it for airport ground fleets, food delivery, wet weather riding, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top