Welcome to Auto, Motorcycle Parts & Accessories official website!
Tank Bag for Zongshen 150: Two-Piece Construction

Tank Bag for Zongshen 150: Two-Piece Construction

Tank Bag for Zongshen 150: Two-Piece ConstructionThis tank bag is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Tank Bag for Zongshen 150: Two-Piece Construction

This tank bag is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Tank Bag for Zongshen 150

Specification

PartTank Bag
FitmentZongshen 150
VersionTwo-Piece Construction
Base materialAnodised Aluminium
Typical useMountain Roads
MOQ200 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time25-35 days after approval
ComplianceDOT

What decides whether it lasts

  • Material — Anodised Aluminium is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Tank Bag production

Processes used on this line

  • injection moulding
  • assembly line testing
  • powder coating
  • gravity casting
  • heat treatment
  • cold forging

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The two-piece construction build is the one most often ordered for mountain roads. Riders also fit it for night riding, rental fleets, long-distance touring, ride-hailing fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top