Header Pipe for Royal Enfield Bullet 350: Two-Piece Construction
This header pipe is built for the Royal Enfield Bullet 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Header Pipe |
|---|---|
| Fitment | Royal Enfield Bullet 350 |
| Version | Two-Piece Construction |
| Base material | Forged Aluminium |
| Typical use | Mountain Roads |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Forged Aluminium is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Bullet 350 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- surface grinding
- assembly line testing
- heat treatment
- rubber vulcanisation
- ultrasonic cleaning
- sintering
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The two-piece construction build is the one most often ordered for mountain roads. Riders also fit it for farm use, long-distance touring, coastal delivery, rental fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







