Welcome to Auto, Motorcycle Parts & Accessories official website!
Throttle Cable for Honda CG125: Two-Piece Construction

Throttle Cable for Honda CG125: Two-Piece Construction

Throttle Cable for Honda CG125: Two-Piece ConstructionThis throttle cable is built for the Honda CG125 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Throttle Cable for Honda CG125: Two-Piece Construction

This throttle cable is built for the Honda CG125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Throttle Cable for Honda CG125

Specification

PartThrottle Cable
FitmentHonda CG125
VersionTwo-Piece Construction
Base materialForged Aluminium
Typical useFarm Use
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-45 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Forged Aluminium is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda CG125 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Throttle Cable production

Processes used on this line

  • injection moulding
  • assembly line testing
  • shot blasting
  • powder coating
  • die casting
  • precision stamping

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for farm use. Riders also fit it for adventure travel, food delivery, construction sites, ride-hailing fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top