Welcome to Auto, Motorcycle Parts & Accessories official website!
Swingarm for Bajaj Pulsar 150: Sealed Unit

Swingarm for Bajaj Pulsar 150: Sealed Unit

Swingarm for Bajaj Pulsar 150: Sealed UnitThis swingarm is built for the Bajaj Pulsar 150 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Swingarm for Bajaj Pulsar 150: Sealed Unit

This swingarm is built for the Bajaj Pulsar 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Swingarm for Bajaj Pulsar 150

Specification

PartSwingarm
FitmentBajaj Pulsar 150
VersionSealed Unit
Base materialBronze
Typical useHeavy Load Hauling
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Bronze is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Bajaj Pulsar 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Swingarm production

Processes used on this line

  • surface grinding
  • shot blasting
  • powder coating
  • laser cutting
  • heat treatment
  • cold forging

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The sealed unit build is the one most often ordered for heavy load hauling. Riders also fit it for roadside assistance, urban courier work, night riding, passenger transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top