Welcome to Auto, Motorcycle Parts & Accessories official website!
Oil Seal for Lifan 110: Upgraded Version

Oil Seal for Lifan 110: Upgraded Version

Oil Seal for Lifan 110: Upgraded VersionThis oil seal is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Oil Seal for Lifan 110: Upgraded Version

This oil seal is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Oil Seal for Lifan 110

Specification

PartOil Seal
FitmentLifan 110
VersionUpgraded Version
Base materialBrass
Typical useAirport Ground Fleets
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-35 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Brass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Lifan 110 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Oil Seal production

Processes used on this line

  • robot welding
  • CNC machining
  • ultrasonic cleaning
  • cold forging
  • laser cutting
  • shot blasting

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The upgraded version build is the one most often ordered for airport ground fleets. Riders also fit it for mountain roads, daily commuting, adventure travel, heavy load hauling.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top