Inner Tube for Royal Enfield Classic 350: Drilled and Slotted
This inner tube is built for the Royal Enfield Classic 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Inner Tube |
|---|---|
| Fitment | Royal Enfield Classic 350 |
| Version | Drilled and Slotted |
| Base material | Carbon Steel |
| Typical use | Night Riding |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Carbon Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Classic 350 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- heat treatment
- anodising
- laser cutting
- cold forging
- rubber vulcanisation
- injection moulding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The drilled and slotted build is the one most often ordered for night riding. Riders also fit it for motocross, security patrols, wet weather riding, night riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







