Kickstart Lever for Kawasaki KX250: Waterproof Version
This kickstart lever is built for the Kawasaki KX250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the waterproof version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Kickstart Lever |
|---|---|
| Fitment | Kawasaki KX250 |
| Version | Waterproof Version |
| Base material | Carbon Steel |
| Typical use | Wet Weather Riding |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — Carbon Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki KX250 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- powder coating
- shot blasting
- gravity casting
- die casting
- CNC machining
- robot welding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The waterproof version build is the one most often ordered for wet weather riding. Riders also fit it for mountain roads, food delivery, roadside assistance, construction sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







