Welcome to Auto, Motorcycle Parts & Accessories official website!
Air Box for KTM EXC 300: Upgraded Version

Air Box for KTM EXC 300: Upgraded Version

Air Box for KTM EXC 300: Upgraded VersionThis air box is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Air Box for KTM EXC 300: Upgraded Version

This air box is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Air Box for KTM EXC 300

Specification

PartAir Box
FitmentKTM EXC 300
VersionUpgraded Version
Base materialSilicone
Typical useRide-Hailing Fleets
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time30-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Silicone is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual KTM EXC 300 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Air Box production

Processes used on this line

  • anodising
  • surface grinding
  • electroplating
  • shot blasting
  • heat treatment
  • sintering

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The upgraded version build is the one most often ordered for ride-hailing fleets. Riders also fit it for passenger transport, wet weather riding, ride-hailing fleets, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top