Clutch Cable for Dayun 150: Waterproof Version
This clutch cable is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the waterproof version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Clutch Cable |
|---|---|
| Fitment | Dayun 150 |
| Version | Waterproof Version |
| Base material | Magnesium Alloy |
| Typical use | Security Patrols |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- powder coating
- sintering
- die casting
- robot welding
- CNC machining
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The waterproof version build is the one most often ordered for security patrols. Riders also fit it for long-distance touring, mining sites, ride-hailing fleets, security patrols.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







