Spark Plug for Dayun 150: Folding Type
This spark plug is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Spark Plug |
|---|---|
| Fitment | Dayun 150 |
| Version | Folding Type |
| Base material | Titanium Alloy |
| Typical use | Food Delivery |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Titanium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- sintering
- rubber vulcanisation
- die casting
- gravity casting
- laser cutting
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The folding type build is the one most often ordered for food delivery. Riders also fit it for roadside assistance, rental fleets, track days, airport ground fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







