Welcome to Auto, Motorcycle Parts & Accessories official website!
AC Hose Pipe for Audi Q5: ABS Plastic

AC Hose Pipe for Audi Q5: ABS Plastic

AC Hose Pipe for Audi Q5: ABS PlasticThis ac hose pipe for the Audi Q5 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

AC Hose Pipe for Audi Q5: ABS Plastic

This ac hose pipe for the Audi Q5 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Audi Q5 AC Hose Pipe

Specification

ProductAC Hose Pipe
Vehicle applicationAudi Q5
Material / finishABS Plastic
Typical useConstruction Sites
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceISO/TS 16949
Packing100 pieces per inner box, 200 per carton

Material options

  • Magnesium Alloy — the cost-effective default for volume programmes
  • Brass — the cost-effective default for volume programmes
  • Reinforced Nylon — the cost-effective default for volume programmes
  • Nylon 66 — the cost-effective default for volume programmes
  • Zinc Plated Steel — chosen where wear resistance comes first

AC Hose Pipe detail

Processes available

  • rubber vulcanisation
  • sintering
  • ultrasonic cleaning
  • laser cutting
  • precision stamping
  • injection moulding

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include roadside assistance, daily commuting, delivery fleets, wet weather riding, construction sites.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top