Welcome to Auto, Motorcycle Parts & Accessories official website!
Idle Control Valve for JAC T6: Powder Coated Steel

Idle Control Valve for JAC T6: Powder Coated Steel

Idle Control Valve for JAC T6: Powder Coated SteelThis idle control valve for the JAC T6 is specified around powder coated steel, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Idle Control Valve for JAC T6: Powder Coated Steel

This idle control valve for the JAC T6 is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a specification nobody had written down. Both are specification problems, and both are preventable.

JAC T6 Idle Control Valve

Specification

ProductIdle Control Valve
Vehicle applicationJAC T6
Material / finishPowder Coated Steel
Typical useHeavy Load Hauling
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time15-55 days after approval
ComplianceCCC
Packing100 pieces per inner box, 1000 per carton

Material options

  • Nylon 66 — specified where the part sits close to a heat source
  • Reinforced Nylon — the cost-effective default for volume programmes
  • Cast Iron — the cost-effective default for volume programmes
  • Anodised Aluminium — the cost-effective default for volume programmes
  • Chromed Steel — used when the finish has to hold a coating

Idle Control Valve detail

Processes available

  • shot blasting
  • cold forging
  • injection moulding
  • robot welding
  • electroplating
  • powder coating

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for heavy load hauling. Related applications include heavy load hauling, rental fleets, weekend riding, adventure travel, wet weather riding.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top